With the help of his dad, Jeff made a ton of progress during November. It is all starting to come together. We might be done before the end of the year!
Getting ready to tile.
Now that Jeff is done with the tile in the bathroom he is working on the hardwood floors in the main room. This went a lot faster than the tile did!
The bathroom is tiled and the sink and toilet have been installed. We just need to get the shower fixtures put in.
This is what will be Jeff's brewery. He should be able to store most of his brewing equipment in the cabinets and the extra large sink will be nice when he has to clean the carboys.
This is the main room. As you can see we still need to install the doors and have some cleaning up to do!
We are almost there! The trim is being put up and then it is a lot of little things here and there to get the room finished: painting the doors and door frames, putting up the blinds, putting the plates on all the light switches and plugs, and some touch up here and there. Jeff is hoping to have it all done by December 7th. We will then move everything down there and hopefully get started on Ryleigh's room. We had hoped to have that done before Christmas, but the basement took a little longer than planned and Jeff is a bit burnt out from doing the basement. We figure as long as it is done by the end of January we are good.